FEB 01 2021
All posts
FEB 01 2021
All posts

MISSION COMPLETE FTL WRAPS UP RAIL PROJECT

OVER THE LAST 5 X MONTHS FTL HAS BEEN SHIPPING WAGONS AND LOCOMOTIVES FOR EXPORT.

38 X WAGONS @ 526 TONNES

4 X LOCOMOTIVES @ 328 TONNE

OVER THE LAST 5 X MONTHS FTL HAS BEEN SHIPPING WAGONS AND LOCOMOTIVES FOR EXPORT.

38 X WAGONS @ 526 TONNES

4 X LOCOMOTIVES @ 328 TONNE

All posts