JAN 01 2021
All posts
JAN 01 2021
All posts

FTL see though the new year assisting drilling rig operations

FTL STAYED ON CALL DURING THIS XMAS BREAK AGAIN ASSISTING WITH DRILLING RIG LOGISTIC OPERATIONS. FTL RAN EQUIPMENT TO THE RIG ON XMAS DAY / BOXING DAY AND NEW YEARS DAY.