MAY 15 2019
All posts
MAY 15 2019
All posts

FTL Moves another 250 tonne of pipe for second drilling campaign

FTL arranged more drill pipe for another drilling campaign. the pipe was meticulously unpacked so not to damage the end caps and delivered to site in time. 




FTL arranged more drill pipe for another drilling campaign. the pipe was meticulously unpacked so not to damage the end caps and delivered to site in time. 




All posts