DEC 23 2022
All posts
DEC 23 2022
All posts

FTL HANDLES 515M3 OF MUD TANKS FOR DRILLING OPERATION

FTL RECENTLY HANDLED MORE DRILLING EQUIPMENT INTO NZ. THIS TIME INTO AUCKLAND PORT.

THE CARGO ARRIVED AT AUCKLAND PORT VIA PART CHARTER. THE MUD TANKS WERE SHIPPED / DISCHARGED / MARSHALLED / SURVEYED & DELIVERED TO DRILLING SITE PRIOR TO XMAS.



FTL RECENTLY HANDLED MORE DRILLING EQUIPMENT INTO NZ. THIS TIME INTO AUCKLAND PORT.

THE CARGO ARRIVED AT AUCKLAND PORT VIA PART CHARTER. THE MUD TANKS WERE SHIPPED / DISCHARGED / MARSHALLED / SURVEYED & DELIVERED TO DRILLING SITE PRIOR TO XMAS.



All posts