DEC 10 2021
All posts
DEC 10 2021
All posts

FTL HANDLE 774 TONNE OF RAILWORKS FROM SHIP CHARTER FOR RAIL TURNOUTS

FTL recently handled import formalities for a project of rail turnouts.

The shipment of 774 tonne and just under 1000 m3 arrived prior to xmas. The shipment required great attention to detail as the shipment needed to be broken into several delivery locations according to serial number and colour code.\

FTL was responsible for hotworks / stevedoring / marshalling / import customs clearance / delivery to respective sites and storage.

The shipment delivered on time and on budget.



FTL recently handled import formalities for a project of rail turnouts.

The shipment of 774 tonne and just under 1000 m3 arrived prior to xmas. The shipment required great attention to detail as the shipment needed to be broken into several delivery locations according to serial number and colour code.\

FTL was responsible for hotworks / stevedoring / marshalling / import customs clearance / delivery to respective sites and storage.

The shipment delivered on time and on budget.



All posts