MAY 26 2020
All posts
MAY 26 2020
All posts

FTL CONTINUES TO FEED POWER STATION

FTL continues to feed product for power station build. The pictures below are from another order of pipework 100 tonnes to site, shipped from door to door incl crane unloading.



FTL continues to feed product for power station build. The pictures below are from another order of pipework 100 tonnes to site, shipped from door to door incl crane unloading.



All posts