MAR 15 2022
All posts
MAR 15 2022
All posts

FTL COMPLETE LOAD OUT FOR ANOTHER DRILLING RIG

FTL recently completed import and load out formalities for another drilling rig. This time to Tauranga port in the Bay Of Plenty.

The rig comprised of 103 x pkgs weighed a total of 1,921,148 kgs and was 7995 m3.