AUG 19 2019
All posts
AUG 19 2019
All posts

Cross trade news - Third shipment for water treatment plant from India to Rarotonga underway

A third shipment of over-sized tanks for the new water treatment plant in Rarotonga has loaded and submitted to the port of Chennai. Flat racks were yet again mobilized from abroad to Chennai, supplied to & loaded by the supplier. FTL arranged local transport to the port / all export formalities & ocean freight to Rarotonga Port. The tanks are 4.55 meters high.




A third shipment of over-sized tanks for the new water treatment plant in Rarotonga has loaded and submitted to the port of Chennai. Flat racks were yet again mobilized from abroad to Chennai, supplied to & loaded by the supplier. FTL arranged local transport to the port / all export formalities & ocean freight to Rarotonga Port. The tanks are 4.55 meters high.




All posts