This is the second shipment of oversized tanks for the new water treatment plant in Rarotonga. Flat racks were mobilized from abroad to Chennai / loaded and transported to the port for oceanfreight to Rarotonga Port.
This is the second shipment of oversized tanks for the new water treatment plant in Rarotonga. Flat racks were mobilized from abroad to Chennai / loaded and transported to the port for oceanfreight to Rarotonga Port.